Hydrogen bookings that account for pressure, not just kilos.
h2pass decides each refuelling on the physical state of the station: how much hydrogen there is, at what pressure, and how much will be produced before the requested time. If it falls short, it explains why with the figure and offers the first slot that works.
A second truck asks for 30 kg at 350 bar
The first one filled 30 kg at 07:00. The station has no grid connection and the sun is not up yet: the electrolyser is not producing. Move the arrival time.
- 500 bar level at the end of the fill
- 325 bar
- Minimum to finish at 350 bar
- 380 bar
- Hydrogen stored
- 377 kg
- Production at that time
- 0 kg/h
Rejected: not enough pressure
The 500-bar level would end at 325 bar and 380 are needed. 377 kg are still stored, but there is not enough pressure to complete the fill. First available slot: 09:10.
Prototype scenario E12. Each position of the slider is the decision of the h2pass booking engine, every 5 minutes, against the station simulated with the La Roda parameters.
Why a calendar is not enough
A hydrogen refuelling station stores hydrogen at several pressures and fills vehicle tanks in cascade: first from the 300 bar level and, to finish, from the 500 bar level. To complete a fill at 350 bar, that last level has to stay above 380 bar until the last kilo.
In La Roda the 500 bar level holds 100 kg of the roughly 400 in storage. A 30 kg truck takes it from 500 down to 384 bar, and only production tops it up: with no grid connection, the electrolyser depends on the sun. Before sunrise, the station can have 377 kg stored and still be unable to complete the next truck's fill.
With a calendar
The dispenser is free at 07:30, so the booking is accepted.
The truck arrives, gets about 20 kg out of 30 and leaves with its tank not full.
With h2pass
The 500 bar level would end at 325 bar, so the booking is rejected.
The driver gets the reason and books 09:10 in one click, when the sun is already driving production.
How each request is decided
h2pass reads the station state at the moment of deciding, with data less than 5 seconds old. It then projects pressure and kilos minute by minute up to the requested time, using forecast production and earlier confirmed bookings. It answers in under a second.
-
Station operational
No alarm prevents refuelling: compressor, dispenser and electrolyser are running, or there is enough stock to cover the fill.
If it fails:
RECH_ALARMA -
Dispenser free
Nobody else is using it during the fill or the 10 minutes of connection and disconnection.
If it fails:
RECH_HUECO -
Enough pressure
The 500 bar level stays above 380 bar until the end of a 350 bar fill. At 700 bar, the final stretch comes from the 900 bar level, which has to stay above 730 bar.
If it fails:
RECH_PRESION -
Enough kilos
Stock, plus forecast production, minus earlier bookings: it has to cover the request with a 10 % margin.
If it fails:
RECH_KG
Pressure comes before kilos
That is what sets h2pass apart from a calendar: the case a calendar cannot see.
Every rejection offers a slot
The reason is given in plain language, with the figure behind it, together with the first slot in the next 24 hours where the same fill does fit.
Intention or firm booking
Drivers can say they will probably come, or book firmly. Only a firm booking reserves kilos; intentions help plan production.
Production follows the bookings
If stored hydrogen is not enough but production up to that time is, h2pass accepts the booking on demand: it reserves the future kilos and asks the electrolyser to produce more.
A planner spreads production over the sunny hours to cover the firm bookings with a margin, and logs every production order together with the booking that caused it.
- From stock
- There are kilos stored at enough pressure. They are reserved for that driver.
- On demand
- Stock is not enough, but forecast production covers it. The booking is accepted and production goes up.
- Rejection
- Neither option works. The reason is explained and another time is offered.
It talks to the station the way it will talk to the real plant
h2pass never reads the simulator directly. Everything goes through the station controller (PLC) over Modbus TCP: bank pressures and temperatures, production flow, compressor and dispenser status, alarms and kilos dispensed.
When the truck arrives, it checks pressure and alarms again against the live reading, and only then writes the fill authorisation, hose and kilos to the controller.
Moving to a real station means changing the IP address and register addresses in the configuration. The booking logic stays the same.
| Register | Variable | Value |
|---|---|---|
| 30001 | 300 bar level | 286.0 bar |
| 30002 | 500 bar level | 482.0 bar |
| 30003 | 900 bar level | 900.0 bar |
| 30008 | Production | 33.3 kg/h |
| 30010 | Dispenser | free |
| 40004 | Authorised hose | 350 bar |
| 40005 | Authorised kilos | 30.00 kg |
Every frame read or written is stored with the real date, register and value in units, and can be exported to CSV. Every decision is stored with the rules evaluated and the reading that caused it.
Tested against a station with real parameters
The prototype runs against a digital twin of a hydrogen station in La Roda (Albacete, Spain) with its parameters: electrolyser, solar plant, compressor, storage levels and dispenser. Where a figure is missing, the value is a documented, configurable assumption.
- Electrolyser
- 2 MW, up to 33.3 kg/h, solar only (10 MWp, no grid connection)
- Compressor
- From 20–40 to 1,000 bar, 360 kg/h
- Storage
- 3 cascade levels: 300, 500 and 900 bar, about 400 kg
- Dispenser
- 350 bar (3 kg/min) and 700 bar hoses
- H2 density
- NIST equation, not ideal gas (which is 33 % off at 500 bar)
- Mass balance
- 0.10 % error over a simulated day, measured with what the controller publishes
Roadmap
h2pass is currently a TRL 6 prototype moving towards a real station.
-
2026 Done
Booking engine and station twin
Rejection for pressure, kilos, slot and alarm, with an alternative slot. Simulator with cascade levels and mass balance. Controller over Modbus TCP with a full trace.
-
2026 Done
Production and platform
Electrolyser setpoint driven by bookings and the sun. Users with roles, customers with their fleet, notifications and a platform in Spanish and English.
-
2026 In progress
Validation campaign
30 simulated days with more than 50 firm bookings.
-
2027 Planned
Real hydrogen station
Connection to the controller of an operating station, payments, integration with fleet systems, mobile app and AFIR data.
Do you run a hydrogen station or a heavy-duty fleet?
We are looking for stations and fleets to take h2pass to a real plant. Tell us about your case and we will show you the prototype running.